ISM-0218 Current in v2026.09.4
Fly lead installation
Guidelines for communications infrastructure › Cabling infrastructure / Fly lead installation
Statement (v2026.09.4)
If TOP SECRET fibre-optic fly leads exceeding five metres in length are used to connect wall outlet boxes to IT equipment, they are run in a protective and easily inspected pathway that is clearly labelled at the IT equipment end with the wall outlet box’s identifier.
- TOP SECRET
- Revision
- 7
- Updated
- Jun-24
- First seen
- v2022.09.14
- Releases containing it
- 26 of 26
History across 26 tracked releases
In statement diffs, removed words are struck through and added words are underlined.
-
Changed v2025.03.31 vs v2024.12.19
Fields changed: Chapter
- Chapter
- Guidelines for Communications Infrastructure changed to Guidelines for communications infrastructure
-
Changed v2024.06.18 vs v2024.03.12
Fields changed: Statement, Revision, Updated
- Statement
If TOP SECRET fibre-optic fly leads exceeding five metres in length are used to connect wall outlet boxes to
ICTIT equipment, they are run in a protective and easily inspected pathway that is clearly labelled at theICTIT equipment end with the wall outlet box’s identifier.- Revision
- 6 changed to 7
- Updated
- Dec-21 changed to Jun-24
-
First tracked v2022.09.14
Present in the earliest release tracked by this site.