{"schemaVersion":1,"controlId":"ISM-1645","status":"current","latestVersion":"v2026.09.4","firstSeen":"v2022.09.14","lastSeen":"v2026.09.4","removedIn":null,"presentIn":26,"control":{"controlId":"ISM-1645","version":"v2026.09.4","title":"ISM-1645","displayTitle":"Floor plan diagrams","chapter":"Guidelines for communications infrastructure","section":"Cabling infrastructure / Floor plan diagrams","topic":"Floor plan diagrams","path":["Guidelines for communications infrastructure","Cabling infrastructure","Floor plan diagrams"],"statement":"Floor plan diagrams are developed, implemented, maintained and regularly verified.","revision":"3","updated":"Jun-26","applicability":["NC","OS","P","S","TS"],"applicabilityLabels":["OFFICIAL","OFFICIAL: Sensitive","PROTECTED","SECRET","TOP SECRET"],"essentialEight":[]},"lastSeenControl":null,"history":[{"type":"introduced","version":"v2022.09.14","baseline":true},{"type":"changed","version":"v2022.12.1","previousVersion":"v2022.09.15","fields":["statement","revision","updated"],"changes":{"statement":{"before":"Floor plan diagrams are maintained and verified on a regular basis.","after":"Floor plan diagrams are developed, implemented, maintained and verified on a regular basis."},"revision":{"before":"1","after":"2"},"updated":{"before":"Mar-22","after":"Dec-22"}}},{"type":"changed","version":"v2025.03.31","previousVersion":"v2024.12.19","fields":["chapter"],"changes":{"chapter":{"before":"Guidelines for Communications Infrastructure","after":"Guidelines for communications infrastructure"}}},{"type":"changed","version":"v2026.06.18","previousVersion":"v2026.03.24","fields":["statement","revision","updated"],"changes":{"statement":{"before":"Floor plan diagrams are developed, implemented, maintained and verified on a regular basis.","after":"Floor plan diagrams are developed, implemented, maintained and regularly verified."},"revision":{"before":"2","after":"3"},"updated":{"before":"Dec-22","after":"Jun-26"}}}]}
